HOCKING BASIN

10 FEB 2012 (EST)
DISCLAIMER


PROJECT at TIMEPOOL
(Feet)
WINTER POOL
(Feet)
OUTFLOW
(cfs)
MAXIMUM OUTFLOW
(cfs)
TOM JENKINS at 0030 721.09 721.00 15.38 835.00

STREAM GAGE at TIMECURRENT STAGE
(Feet)
FLOOD STAGE
(Feet)
ENTERPRISE at 2400 2.37 12.00
TOM JENKINS "A" GAGE at 0030 7.44 ---
GLOUSTER at 2400 3.43 15.50
ATHENS at 2400 5.49 20.00

PRECIP GAGE at TIME 1 HOUR PRECIP
(Inches)
6 HOUR PRECIP
(Inches)
24 HOUR PRECIP
(Inches)
NEW LEXINGTON at 0030 0.00 0.00 .10
ENTERPRISE at 2400 0.00 0.00 0.00
TOM JENKINS at 0030 0.00 0.00 0.00